You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Saluran PHB di Jakbar Akan Segera di Sheet Pile

Sheet Pile to Be Installed at 3 Connecting Channels

Three connecting channels in West Jakarta will be installed with sheet pile. The effort is aimed to minimize puddle at areas passed by the channel.

Sheet pile installation is aimed to minimize puddle

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin said those three connecting channels are Taman Ratu, Bendungan Cisadane Timur and Kali Duri.

“Sheet pile installation is aimed to minimize puddle,” he said, Monday (8/21).

Lots of Channels in S. Jakarta Covered by Buildings

According to him, Taman Ratu has length 2.4 kilometer, Bendungan Cisadane 900 meter and Kali Duri 900 meter.

“It will start this week by preparing Rp 85 billion. It is targeted to complete on December 20,” he closed.

Linked News
Popular News indeks
  1. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye929 personAldi Geri Lumban Tobing
  2. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye834 personAldi Geri Lumban Tobing
  3. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye817 personAldi Geri Lumban Tobing
  4. Pramono Praises JRF, Says City Is Becoming a Trusted Event Host

    access_time23-10-2026 remove_red_eye666 personDessy Suciati
  5. Jakarta Records Improved Air Quality on First Day of JRF 2026

    access_time24-10-2026 remove_red_eye649 personBudhi Firmansyah Surapati